Skip to content
Get a Quote

Shipping from China to Ghana

Shanghai to Tema is a KFY shipping lane for used construction machinery. A useful enquiry starts with the machine as it will travel, including the dimensions of the main unit and any attachments packed separately.

A red-hulled cargo ship lies alongside blue transit sheds at sunset.
AI-generated industry illustration
Shanghai → TemaUsed construction machinerySee this lane

Which parts of the machine will travel together?

A used tracked excavator stands with its boom and bucket folded in.

One assembled machine

Give its make and model, transport dimensions, weight and present location. Current photographs help the commercial team and handling partners assess the load described.

A detached bucket, quick coupler and breaker rest on separate steel supports.

Machine and separate attachments

List each bucket or other attachment with its own dimensions and weight. Mark the items that must arrive together so the quote covers the full consignment.

A tracked excavator sits on a ship’s hatch cover with chains running to deck securing points.
AI-generated cargo illustration

Customer shipment

Used excavator to Tema

A customer in China entrusted KFY with port-to-port transport for a used excavator. KFY coordinated breakbulk vessel resources and securing arrangements during loading. The agreed service ended at the designated port of Tema in Ghana.

Prepare a machinery enquiry
A port clerk and a collector review documents at a quayside counter.

For collection at Tema, identify who will receive the machine and any attachments listed separately.

Plan collection after the port handover

Give the receiving agent the machine particulars early. Ask who will confirm release at Tema, arrange collection for the equipment and price the inland leg to the worksite.

Send this brief to your machinery supplier

Ask the supplier to fill in the first three lines and attach current photos. Add the Tema handover details with your receiving agent.

  • Main unit — make/model, travel dimensions (L × W × H in metres) and gross weight in kg
  • Loose attachments — description, quantity, packed dimensions and weight for each
  • Pickup — cargo-ready city in China, site contact and release date
  • Handover — Tema Port, receiving party and who arranges release and onward collection

Before you book

Does the excavator case include delivery to a Ghanaian worksite?

The customer’s order ended at Tema Port. For a new machine, identify the party arranging release and site transport, and request those costs separately if needed.

Port reference · Ghana Ports and Harbours Authority · Port of Tema

Discuss your shipment to Ghana

Give the actual cargo-ready location in China, the packed load and your requested handover point. Your supplier can prepare the cargo for agreed pickup or deliver it to the designated receiving point.

Discuss a machinery shipment
CBM Calculator