Skip to content
Get a Quote

Shipping Solar Panels from China by Sea

Start with the size and gross weight of each packed pallet.

For solar modules, measure to the outside of the protective packing, including the pallet base. List inverter crates and mounting rails separately. With the ready date and pickup address for each supplier, KFY can assess whether to collect the loads together or quote them separately.

Solar modules secured on a pallet beside an export container.

Products in Your Solar Order

Solar modules

Provide module quantities and the number, dimensions and gross weight of the packed pallets.

Inverters and electrical equipment

List each product and its packing separately. Identify any equipment supplied with batteries.

Mounting systems and accessories

Include rails, brackets, cables and connectors, with bundle lengths and package details.

Orders from several suppliers

Share collection locations and readiness dates so the different parts of the order can be coordinated.

Protective packaging and pallet details for solar modules awaiting export.

Build the Plan Around the Packed Cargo

Choose a suitable container arrangement

A full container can be assessed for larger orders. For smaller shipments, LCL or consolidation may be considered after reviewing the package sizes, handling needs and available service.

Confirm packaging before collection

Send packing photographs and the supplier's handling and stacking instructions. The review should use the finished shipping units, including pallets, protective materials and any long accessories.

Coordinate the complete order

Modules, inverters and mounting components may be ready at different times. Agree collection or warehouse delivery dates and identify which items need to travel together.

From Factory Readiness to Export Handover

  1. Map the order

    Collect the product list, supplier locations and expected readiness dates.

  2. Review the packages

    Check the packing list, dimensions, weights, photographs and handling information.

  3. Coordinate collection and loading

    Arrange the agreed pickup or warehouse handover and loading sequence.

  4. Prepare for departure

    Coordinate export handover, sea freight and updates through the agreed shipment stages.

Information to Prepare

  • Product types, models and quantities.
  • Pallet or package count, packed dimensions and gross weight.
  • Packing photographs and supplier handling instructions.
  • Supplier addresses and readiness dates.
  • Destination port and preferred shipment timing.
  • A separate list of batteries or battery-containing equipment, if included.

Example enquiry for palletised solar panels

The example uses outer shipping dimensions (length × width × height). Gross weight includes the pallet and packing. The optional inverter and rail bundle sit outside the module totals.

Please quote two pallets of solar modules from our Suzhou supplier via Shanghai to Rotterdam. Both are ready for collection on the same day.

  • Module pallets: 2 pallets, each 230 × 115 × 125 cm and 780 kg gross. Combined volume is 6.61 m³ and total gross weight is 1,560 kg.
  • Stacking: Please allow no load on top for this quote. We can send packing photos and the manufacturer’s stacking instructions before booking.
  • Optional second pickup: Another supplier has one inverter crate (100 × 80 × 90 cm, 145 kg gross) and one mounting rail bundle (320 × 35 × 30 cm, 105 kg gross), both ready three days later.

Please price the two module pallets on their own, then show the extra collection and consolidation costs if we wait for the second supplier.

See how to specify the Rotterdam port handover

Frequently Asked Questions

Can modules from one factory travel with equipment from another?

We can coordinate multiple suppliers. Whether the products can be combined in one shipment depends on their packing, readiness dates, compatibility and agreed loading arrangement.

Do I need a full container?

Not every order does. Share the packed volume, weight and handling requirements so full-container and suitable consolidation options can be reviewed.

Can a module count alone be used to confirm freight?

It can start a discussion. A usable shipment plan also needs pallet or package dimensions, gross weights, collection details and the destination.

What if the order includes energy storage batteries?

List them separately and provide their specifications. Battery-containing cargo needs its own review before it is included in the proposed arrangement.

Ready to Plan Your Solar Shipment?

Send your product list, packing details and destination port. We will help coordinate the next steps with your suppliers.

Send Your PV Cargo Details
CBM Calculator