Skip to content
Get a Quote

Warehousing and consolidation in China

Buying from several factories? KFY can coordinate pickup or supplier delivery to a designated receiving point in China. Plan the first arrival, the last batch and the date you need to decide what ships together.

Three distinct supplier loads sit in separate marked lanes of a receiving warehouse.
  1. Agree receiving dates
  2. Match the batches
  3. Confirm the release
A bright orange batch tag identifies a wrapped pallet beside a separately marked load.Wrapped consignments staged in a receiving area.

Keep each supplier visible in the combined load

Two factories may both mark their first carton “1 of 10”. Ask them to add their own order or supplier reference. A receiving contact can then identify which delivery has arrived and which cartons are still at the factory.

Collection from a supplier

You and your supplier prepare the goods for the agreed date. Share the collection address and packed size so we can confirm pickup arrangements for that batch.

Delivery to a designated warehouse

If your supplier arranges delivery, get the designated address, receiving instructions and timing before the truck leaves. Match each delivery to its supplier and purchase order.

From two ready dates to one shipping decision

  1. List each batch

    For example, a pallet of fittings may be ready on Monday while the matching components are due the following week. Record both dates and identify whether either batch can ship independently.

  2. Agree how long to wait

    Before the first batch moves, compare the cost of receiving and holding it with leaving it at the factory. If the second batch slips, decide whether to wait or release the goods already available.

  3. Choose the sea movement

    Once you know the combined packed weight, dimensions and number of packages, compare FCL for a dedicated container with LCL for shared container space. Agree the destination port before dispatch.

One order is packed while another is still being made

Imagine a buyer ordering lamp bases and shades from two factories. The bases are ready first. Before releasing them, the buyer compares holding them at the factory with sending them to the designated warehouse. It agrees a decision date with both suppliers in case the shades are late.

Blue totes and a wrapped pallet secured inside a container, with another pallet waiting at the dock.
Illustrative shipment scenario · AI-generated image
Two suppliers, one release decision
  1. Lamp basesFirst batch ready. Agree where it can wait and what waiting will cost.
  2. Lamp shadesConfirm the second factory’s actual ready date before dispatch.
  3. Buyer’s decisionRelease the batches together or send the bases first. Record which order goes in each shipment.

Prepare one handover line per supplier

Use a purchase order reference your factory can mark on the packages. For example:

Supplier A, Ningbo · PO 1042 · ready 12 June · 8 cartons · supplier delivers to the agreed receiving point · hold for PO 1043 unless buyer authorises a split.

  • Supplier cities and a reference for each order
  • Packed quantity, weight and dimensions by batch
  • Ready dates and proposed pickup or delivery arrangements
  • Destination port and which orders must travel together

Common questions

Can my supplier send goods before the other orders are ready?

First agree the receiving address, timing and any costs while the first batch waits. Give the supplier the agreed instructions before authorizing dispatch.

Do I need LCL if several suppliers are involved?

You can combine several suppliers’ goods before either FCL or LCL shipping. The container choice depends on the combined shipment and how you want it to travel.

Does receiving a carton include a product inspection?

Specify the checks you need and get their scope and cost agreed separately. A shipment arriving at the receiving point does not establish that the products inside have been inspected.

CBM Calculator