Skip to content
Get a Quote

Construction Machinery Shipping from China

Start with the machine's transport dimensions and handling needs.

KFY LOGISTICS helps machinery buyers coordinate equipment release, origin transport and sea freight from China. We review each machine in its shipping configuration, including attachments and packing, to develop an arrangement suited to the cargo and proposed route.

Construction equipment stowed on a cargo ship deck.

Equipment in Your Shipment

Excavators and tracked machines

Share the model, operating condition and dimensions with the boom, bucket and other attachments in their intended transport position.

Loaders and wheeled equipment

Confirm whether each unit can move, steer and brake, together with its transport dimensions and weight.

Used construction equipment

Provide current photographs and details of condition, modifications and any known faults before a shipping option is assessed.

Attachments and spare parts

List buckets, booms, counterweights and other separate items with their own packing details and weights.

Tracked excavator on a low-loader trailer during port transport preparation.

Match the Shipping Option to the Machine

Container options

Standard containers may suit smaller machines or suitable dismantled units. Open-top or flat-rack arrangements can be assessed when dimensions, weight or loading access require another approach.

RoRo options

RoRo can be considered for eligible equipment on available routes. Acceptance depends on the machine, handling method, operating condition and the carrier's requirements.

Other project arrangements

Where container or RoRo options do not fit, a breakbulk or other project arrangement may be reviewed. The proposal needs actual cargo measurements, handling information and route availability.

From Equipment Release to Port Handover

  1. Confirm the transport configuration

    Review machine specifications, attachments, packed dimensions and weight.

  2. Review collection and loading

    Identify pickup access, suitable origin transport and the information needed by handling parties.

  3. Agree the shipment arrangement

    Coordinate the proposed route, loading method, preparation responsibilities and handover date.

  4. Coordinate departure

    Arrange the agreed export handover and sea freight, with updates through the shipment stages.

Information to Prepare

  • Make, model, quantity and new or used condition.
  • Transport length, width, height and weight for each unit.
  • Photographs from several angles and details of separate attachments.
  • Whether the machine can move, steer and brake as applicable.
  • Manufacturer handling information, including available lifting and securing points.
  • Pickup address, site access, readiness date and destination port.

Frequently Asked Questions

Does an excavator have to travel by RoRo?

No single mode suits every excavator. Its size, weight, transport configuration and available route determine which arrangements can be assessed.

Can you review a used machine?

Yes. Send current condition details and photographs. The proposed arrangement remains subject to the equipment, route and acceptance requirements.

Should attachments be removed before shipment?

Confirm the proposed configuration before making changes. Any dismantling, packing and reassembly responsibilities should be agreed with the supplier and relevant handling parties.

Is the catalogue weight enough for a quotation?

Use the actual shipping configuration. Attachments, modifications, fluids, packing and transport supports can affect the details needed for a practical plan.

Send Us the Machine Details

Share photographs, transport dimensions, weight and the destination port. We will help review the collection and shipping options.

Send Your Machinery Details
CBM Calculator