Skip to content
Get a Quote

Air freight from China

When stock has to reach a buyer by a particular date, start with the pieces that carry the deadline. Compare flight options from China against the time and place your receiver actually needs them.

An airport tug tows two netted cargo pallets across the apron.
  1. Cargo release
  2. Airport acceptance
  3. Destination handover
Strapped cartons on a platform scale at a cargo terminal.Cargo aircraft on an airport apron.

Work back from the receiving window

A flight arrival is only one point in an air shipment. Give us the factory release time, the destination airport and the receiver’s opening hours. This lets us discuss collection and terminal handover with you and identify any onward movement that needs its own arrangement.

A few pieces have a deadline

Separate those pieces on the packing list. Give their packed weight and dimensions so the urgent batch can be considered on its own.

The entire order must arrive together

Give the date the last piece will be packed and say where your customer needs the complete order. An airport arrival and a delivery appointment are different milestones.

Prepare a request for air freight

  1. Identify the ready cargo

    Give the factory city and the earliest date the supplier can release the packed goods. Label any provisional figures.

  2. Define the deadline

    Name the arrival airport or receiving address. Include the local date and time of a fixed event or appointment.

  3. Ask about availability

    Ask which routing, cargo acceptance and handover are available for that date before releasing goods to a carrier.

One order, two delivery dates

Suppose a retailer needs four cartons of display samples for an exhibition. The remaining stock can follow by sea. Separate the four cartons on the packing list, give their packed weight and dimensions, and identify whether the required handover is at the airport or at the exhibition venue.

Four cartons on a blue airport trolley, separate from a larger wrapped load at the cargo terminal.
Illustrative shipment scenario · AI-generated image
Two clocks to check
  1. Cargo readyWhen the packed goods can actually be collected.
  2. Airport arrivalWhen the flight is expected at the destination.
  3. Final handoverWhen the receiver needs the goods at the named place.

What to prepare

  • Pickup city and proposed destination airport or city
  • Product description, packed sizes and gross weights
  • Quantity in the urgent batch and its ready date
  • Required arrival or delivery date and place

Common questions

What if the supplier only knows the product weight?

Ask for an estimate of the packed dimensions and gross weight, including the carton or pallet. State which measurements are provisional.

Which date should I give if the goods are for a trade show?

Give the receiving deadline at the venue and the factory release date. Mention any delivery appointment or receiving hours that affect the time between those two points.

CBM Calculator